Certified Scrum Master – Exam 1

  • Fee: Certified Scrum Master – Exam 1 https://www.accessibilityassociation.org/ )
  • Passing score: 95%
  • Time limit: 60 minutes
  • Number of questions: 50
  • Format: Multiple Choice, Multi Answer and True/False
  • Difficulty: Advance
3

You have 60 min to complete 50 questions.


Created on

Certified Scrum Master - Exam 1

Certified Scrum Master - Exam 1

1 / 50

Scrum is built upon by the collective intelligence of the people using it. 

2 / 50

What is Increment of Value?

3 / 50

What is cadence?

4 / 50

Scrum is a lightweight framework that helps people, teams and organizations generate value through adaptive solutions for _______________.

5 / 50

Scrum is a lightweight framework that helps people, teams and organizations generate value through ______________ for complex problems. 

6 / 50

The Scrum framework is purposefully incomplete, only defining the parts required to implement Scrum theory. 

7 / 50

The _____________ turns a selection of the work into an Increment of value during a Sprint. 

8 / 50

Scrum combines ________  formal events for inspection and adaptation within a containing event, the Sprint. 

9 / 50

Scrum events are designed to __________  change. 

10 / 50

Scrum is a ________________ that helps people, teams and organizations generate value through adaptive solutions for complex problems. 

11 / 50

Artifacts that have low transparency can lead to decisions that :

A) diminish value

B) cancel projects

C) increase risk

D) strategic loss

12 / 50

A _______________ orders the work for a complex problem into a Product Backlog. 

13 / 50

What must be inspected frequently and diligently to detect potentially undesirable variances or problems?

A) The Scrum artifacts

B) The Project list

C) The progress toward agreed goals

D) The updated product list

14 / 50

What enables inpection?

15 / 50

Scrum requires a _____________  to foster an environment.

16 / 50

The Scrum Team and its stakeholders inspect the results and adjust for the ____________. 

17 / 50

Scrum is built upon by the _____________  of the people using it 

18 / 50

The emergent process and work must be visible to those performing the work as well as those receiving the work. This is called ___________________.

19 / 50

Rather than provide people with detailed instructions, the rules of Scrum guide their__________  and _____________. 

20 / 50

Empiricism asserts that knowledge comes from_____________ and ____________  based on what is observed.

21 / 50

Inspection enables _______________. 

22 / 50

Various _________________ can be employed within the framework.

A) processes

B) techniques

C) methods

D) adaptations

 

23 / 50

These events work because they implement the empirical Scrum pillars of

A) transparency

B) inspection

C) collaboration

D) adaptation

24 / 50

_____________  without adaptation is considered pointless. 

25 / 50

Scrum employs an ___________________  approach to optimize predictability and to control risk. 

26 / 50

Scrum makes visible the relative efficacy of current ___________________, so that improvements can be made. 

A) management

B) environment

C) work techniques

D) methodologies

27 / 50

What is the first step in the Scrum Process?

28 / 50

The ______________  and its___________  inspect the results and adjust for the next Sprint. 

29 / 50

What provokes change?

30 / 50

The emergent process and work must be __________  to those performing the work as well as those receiving the work.

31 / 50

____________ asserts that knowledge comes from experience and making decisions based on what is observed. 

32 / 50

Scrum is founded on__________  and _____________. 

33 / 50

What is Empricism?

34 / 50

Who inspect the results and adjust for the next Sprint?

35 / 50

Scrum wraps around ________________  or renders them unnecessary.

36 / 50

Artifacts that have _______________  can lead to decisions that diminish value and increase risk. 

37 / 50

Scrum requires a Scrum Master to foster an environment where: 

38 / 50

If any aspects of a process deviate outside acceptable limits or if the resulting product is unacceptable, the process being applied or the materials being produced must be adjusted. This process is called?

39 / 50

To help with inspection, Scrum provides___________  in the form of its five events. 

40 / 50

Scrum engages groups of people who collectively have all the skills and expertise to do the work and share or acquire such skills as needed. 

41 / 50

______________  reduces waste and focuses on the essentials. 

42 / 50

With Scrum, important decisions are based on the perceived state of its______________ formal artifacts. 

43 / 50

The process to frequently and diligently detect potentially undesirable variances or problems is called _______________.

44 / 50

____________  without transparency is misleading and wasteful. 

45 / 50

The Scrum Team turns a selection of the work into an _____________ during a Sprint. 

46 / 50

The Scrum Team turns a selection of the work into an Increment of value during a_______________. 

47 / 50

Scrum combines four formal events for inspection and adaptation within a containing event, called ___________. 

48 / 50

These events  of transparency, inspection, and adaptation are called __________________.

49 / 50

A Product Owner orders the work for a complex problem into a _________________. 

50 / 50

Transparency enables _______________.

Your score is

The average score is 67%

0%

error: Content is protected !!
Scroll to Top