0% You have 1 hours to pass the Assessment Test. PSM 1 - Additional Practice Questions 1 1 / 80 Who is required to attend the Daily Scrum? Scrum Master Development Team and Scrum Master Development Team Development Team and Product Owner 2 / 80 Who acts as a mentor or coach for the team. Development Team Scrum Master Project Manager Product Owner 3 / 80 The team is able to use the feedback provided by inspection to adjust what they are doing. This is called ____________. Adaption Transparency Openness Inspection 4 / 80 Who is responsible for reviewing both the value of the individual items and the ordering or ranking of the backlog items by relative priority. Stakeholders Scrum Master Product Owner Development Team 5 / 80 What is the maximum amount of time a sprint retrospective should take? 3 hours, for an 30 days Sprint 1 and half hour 1 hour 6 / 80 What is the recommended size for a Development Team? 9 7, +2 or -2 6 6, +3 or -3 7 / 80 Each day during the sprint the team has a daily scrum meeting _________________. to update Product Manager to track progress and refocus. to plan and assign work. to update Scrum Master 8 / 80 The Scrum Master role is described as a _______________ role. decision maker authoritative servant-leader learned 9 / 80 Who is responsible to ensure and help the team to understand the scrum process and to ensure that the process is being followed. Product Owner Development Team Scrum Master Stakeholders 10 / 80 As the Sprint planning progresses, the workload has grown beyond the development team's capacity. Which action makes most sense for the Team? Collaborate with the Product Owner and potentially remove or change items Work overtime for the Sprint Star the Sprint and recruit additional team members Cancel the Sprint 11 / 80 _________________ may have particular areas of expertise or experience but can work on any task that needs to be done. Product Owner Business Analyst Scrum Master Development Teams 12 / 80 When should the Product Owner ship or implement a Sprint increment? When it makes sense When the Team feels is done with every Sprint At the end of every Sprint Whenever the increment is free of defects 13 / 80 Which objectives are covered as part of Sprint Planning? Updating the scope of the release with all Sprints, end dates, and costs Recalculating empirical velocity, adjusting team capacity accordingly, and projecting end dates Understanding what functionality the Product Owner desires within the next Sprint and figuring out how to do it. Reviewing current functionality that binds the software solution 14 / 80 Development Team consists of between _______ and ______ people with the skills required to deliver the product. seven, eleven four, nine three, nine three, twelve 15 / 80 There is a regular and honest checking of results against predictions. It is called _____________. Inspection Framework Challenges Adaptation 16 / 80 It is the ______________ which decides who works on which tasks and on almost all aspects of how they work to deliver the product. Scrum Team Product Owner Development Team Project Manager 17 / 80 A Scrum development team is ____________ group. an independent a non-structured a goal oriented a cross-functional 18 / 80 Who is ultimate responsible for the Product Backlog item estimates? Project Owner Scrum Master The Development Team Stakeholders 19 / 80 Whose main responsibility is "maximizing the value of the product and the work of the team". Development Team Product Owner Scrum Team Scrum Master 20 / 80 A progress is based on observation and experimentation instead of detailed, upfront planning and defined processes. This is called _________________. Complex process Agile Process Adaptation Empirical process 21 / 80 Who defines the Sprint Backlog scope? Product Owner Stakeholders Scrum Master Development Team 22 / 80 The time-box limit for 1 month Sprint is ______________. 4hrs 10hrs 8hrs 3hrs 23 / 80 _______________ is a core concept in Scrum. Enhancements Sprint Iteration Product Backlog 24 / 80 Upon what type of process control is Scrum based? Defined Empirical Complex Hybrid 25 / 80 What happens when all commited itens (requirements) are not completed at the end of the Sprint? The Sprint duration is extended None of the above They return to the product backlog The tasks are determined to be unnecessary 26 / 80 What is the Release Burndown? A graph indicating what has been completed by the Scrum Team The work remaining to be completed by the Product Owner What has been completed by the Scrum Team to date A measure of the remaining Product Backlog across the time of a release plan 27 / 80 The correct sequence of events in using Scrum framework is as follows: Sprint Planning, Sprint, Daily Scrum, Sprint Review, and Sprint Retrospective Sprint Planning, Daily Scrum, Sprint, Sprint Review, and Sprint Retrospective Sprint Planning, Sprint, Sprint Retrospective, Daily Scrum, and Sprint Review Sprint Planning, Sprint, Sprint Retrospective, Daily Scrum, and Sprint Review 28 / 80 Is Scrum Master a "management" position? No Yes 29 / 80 he Development Team should have all the skills needed to: Complete the project as estimated when the date and cost are committed to the Product Owner. Turn the Product Backlog it selects into an increment of potentially shippable product functionality. Do all of the development work, but not the types of testing that require specialized testing, tools, and environments. 30 / 80 ______________ is responsible to make sure that the 'Product Backlog' is kept up to date. Scrum Master Product Owner Development Team Stakeholder 31 / 80 What is the major difference between Product Backlog and Sprint Backlog? The Product Backlog is a subset of the Sprint Backlog The Sprint Backlog is a subset of the Product Backlog The Product Backlog is equal to the Sprint Backlog The Sprint Backlog is owned by the Product Owner 32 / 80 When is the Sprint Backlog created? During the Sprint Planning meeting During the Sprint Prior to the Sprint Planning meeting At the beginning of the project 33 / 80 The thinking behind this time-box is that it helps to focus the discussion on the most critical or relevant items. True False 34 / 80 Who determines when it is appropriate to update the Sprint Backlog during a Sprint? The Development Team The Scrum Team The Project Manager The Product Owner 35 / 80 On a new Scrum Team, the Development Team tell the Scrum Master that they dont feel the need for retrospectives. which answer is correct: Discuss with product owner Start doing retrospectives None of above 36 / 80 ______________ and the team may be missing some skills. Less than nine people Less than three people Less than seven Less than four people 37 / 80 More than one Scrum Team is working on a single project or release. How should the Product Backlog be arranged? All Scrum Teams work from a common Product Backlog and integrate their work every sprint Only one Scrum Team should work on Scrum project Scrum Teams should have their separate Product Backlogs A separate Product Backlog is constructed for each Scrum Team. All of the increments are integrated at the end in an integration Sprint 38 / 80 What happens when the Sprint is cancelled? The completed Sprint Backlog items are evaluated for a release and incomplete items are put back to the Product Backlog The Scrum Team disbands immediately The complete Sprint Backlog is put back to the Product Backlog The completed Sprint Backlog items are evaluated for a release and incomplete items are discarded 39 / 80 The Sprint period is short because it allows for faster feedback for the team and can restrict changes of scope during the sprint. True False 40 / 80 The most encouraged time of day to hold a Scrum Daily Meeting is: End of the day A beginning of the day Before lunch Immediately after lunch 41 / 80 Development Team with __________________ and self-organizing and keeping people informed becomes difficult. More than five people More than twelve people More than nine people More than seven people 42 / 80 The Scrum framework (team roles, events, artifacts and rules) captures a valid _____________. Empirical approach. Sprint Planning Sprint Review Inspection 43 / 80 When many Scrum Teams are working on the same product, should all of their increments be integrated every Sprint? Yes, otherwise Product Owners may not be able to inspect what is done accurately No, that is far too hard No, each Scrum Team stands alone Yes, but only the Scrum's Teams whose work has dependencies 44 / 80 What is the primary responsibility of the Scrum Master? To manage the Development Team To Prioritize the Product Backlog To remove any impediments the Development Team encounters during their work To work with the Product Owner to develop the Product Backlog 45 / 80 _________________ is the description of what the team aims to achieve during the sprint Product refinement list The Product list The Sprint Goal Product increment list 46 / 80 ________________ is the 'working software' at the end of the increment. Scrum items Product backlog The Product increment The Sprint backlog 47 / 80 The Sprint Backlog is owned by? The Scrum Master and Development Team The Product Owner The Development Team The Scrum Master 48 / 80 The team plans any new work or changes of priority at _________________. the start of new Release the end of Sprint Cycle the end of new Release the start of the next Sprint 49 / 80 Development Team members volunteer to own a Sprint Backlog item: During the Daily Scrum At the Sprint planning meeting Never. All Sprint Backlog Items are "owned" by the entire Development Team, even though each one may be done by an individual team member Whenever a team member can accommodate more work 50 / 80 The Product Backlog is mainteined by: The Scrum Master The Product Owner and Scrum Master The Product Owner The Development Team 51 / 80 The short period during which the team works on a specific goal is called _______________. Sprint a Release Iteration Sprint Cycle 52 / 80 Which of these may a Development Team deliver at the end of a Sprint (choose 2)?A) A single document, if that is what the Product Owner asked forB) An increment of software with minor known bugs in itC) Failing unit tests, to identify acceptance tests for the next SprintD) An increment of working software that is "done." A only C and D B and D D only 53 / 80 When many Scrum Teams are working on a project, what best describes the definition of "done"? Each Team defines and uses its own Each Team uses its own but must make it clear to all other Teams It depends All teams must use the same definition 54 / 80 Who is responsible to clarify details as necessary as the team develops the product. Stakeholders Scrum Master Product Owner Development Team 55 / 80 What does the Sprint Backlog consist of? User Stories, only. Test cases Selected Backlog Items and Tasks Use Cases 56 / 80 What is the Scrum? None of above It's not a Agile Framework A framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value Scrum is a complete process to develop software 57 / 80 Who is responsible to ensure that the backlog is visible and understood by other stakeholders. Product Owner Stakeholders Scrum Master Development Team 58 / 80 Which two are properties of the Daily Scrum? (Choose 2)A) It is fifteen minutes or less in duration.B) It is facilitated by the team lead.C) It consists of the Scrum Master asking the Team members the three questions.D) Its location and time should remain constant. AD AB CD BC 59 / 80 Who is on the Scrum Team?A) Project ManagerB) Project OwnerC) Product OwnerD) Development TeamE) ManagerF) CEOG) Scrum Master ADG CDG DFG BDF 60 / 80 What is the primary way a Scrum Master keeps a Development Team working at its highest level of productivity? By keeping high value features high in the Product Backlog By facilitating Development Team decisions and removing impediments By preventing changes to the Backlog once the Sprint begins By ensuring the meetings start and end at the proper time 61 / 80 Who determines the business value of each item the team could be working on. Stakeholder Product Owner Scrum Master Development Team 62 / 80 The Sprint Goal is selected before the Sprint Backlog is created. True False 63 / 80 It is a starting structure that is rigid and teams can build on. It is absolute and prescriptive. This is ______________. Inspection Adaptation Scrum a Project Plan 64 / 80 What is the maximum time that Scrum recommends the team spend in the daily scrum (daily standup)? Four hours Thirty minutes As long as it takes Fifteen minutes One hour 65 / 80 Which three activities will a Product Owner likely engage in during a Sprint?A) Run the daily ScrumB) Answer questions from the Development Team about items in the current SprintC) Update the Sprint burndown chartD) Work with the stakeholdersE) Prioritize the Development Team's activities.F) Provide feedback BDF ACF ACE ABCE 66 / 80 Who should know the most about the progress toward a business objective or a release, and be able to explain the alternatives most clearly? The Development Team The Project Manager The Scrum Master The Product Owner 67 / 80 __________________ represents the sum of all the product backlog items delivered by the team. Product Increment document Sprint plan Sprint refinement document Sprint backlog 68 / 80 The sprint finishes with two events a _____________ and a ________________. Sprint Retrospective, Done Document. Sprint approval, Sprint Re-planning Sprint Review, Sprint Retrospective Sprint goal, Sprint Review 69 / 80 In ______________ the goals are likely to change during the time the team is working on them. Adaptive Complex System Inspection Iterative 70 / 80 who is part of the the Sprint and iteration Planning Meeting? Scrum Master and Development Team Product Owner and Stakeholder Product Owner and Development Team Product Owner and Scrum Master 71 / 80 Product Owner are free to involve the team as much as they want in Scrum process and should take no more than ______ of the rest of the time of the team. 15% 5% 20% 10% 72 / 80 Everyone knows what is happening and what the results are at each stage. It is called ______________. Transparency Prioritization Adaptation Iterative 73 / 80 Which statement best describes Scrum? A complete methodology that defines how to develop software A cookbook that defines best practices for software development A framework within which complex products in complex environments are developed A defined and predictive process that conforms to the principles of Scientific Management 74 / 80 Which of the following might the Scrum Team discuss during a Sprint Retrospective? Methods of communication The way the Scrum Team does Sprint Planning All of the above Skills needed to improve the Development Team's ability to deliver Its Definition of Done 75 / 80 Which three questions are answered by all Development Team members at the Daily Scrum?A) What work am I going to do today?B) Why were you late?C) What impediments are in the way of my accomplishing my work?D) What work did I do yesterday?E) How is the Sprint proceeding? CDE BDE ABD ACD 76 / 80 Who is responsible to ensure and work to remove impediments preventing the team from making progress. Development Team Product Owner Scrum Master Stakeholder 77 / 80 Who has the authority to cancel a Sprint? The Scrum Master The team members The Development Team The Product Owner 78 / 80 The Sprint starts with a _______________. Sprint Retrospective Sprint Estimates Sprint planning meeting. Sprint goal. 79 / 80 Who acts as a point of contact between the team and the wider organization. Scrum Master Stakeholder Product Owner Development 80 / 80 In Development Team there are no specific roles relating to skills or experience or business function. Therefore it is ___________________. learned. non transparent independent cross-functional Your score is The average score is 78% LinkedIn Facebook Twitter 0% Restart quiz
You have 1 hours to pass the Assessment Test.
PSM 1 - Additional Practice Questions 1
1 / 80
Who is required to attend the Daily Scrum?
2 / 80
Who acts as a mentor or coach for the team.
3 / 80
The team is able to use the feedback provided by inspection to adjust what they are doing. This is called ____________.
4 / 80
Who is responsible for reviewing both the value of the individual items and the ordering or ranking of the backlog items by relative priority.
5 / 80
What is the maximum amount of time a sprint retrospective should take?
6 / 80
What is the recommended size for a Development Team?
7 / 80
Each day during the sprint the team has a daily scrum meeting _________________.
8 / 80
The Scrum Master role is described as a _______________ role.
9 / 80
Who is responsible to ensure and help the team to understand the scrum process and to ensure that the process is being followed.
10 / 80
As the Sprint planning progresses, the workload has grown beyond the development team's capacity. Which action makes most sense for the Team?
11 / 80
_________________ may have particular areas of expertise or experience but can work on any task that needs to be done.
12 / 80
When should the Product Owner ship or implement a Sprint increment?
13 / 80
Which objectives are covered as part of Sprint Planning?
14 / 80
Development Team consists of between _______ and ______ people with the skills required to deliver the product.
15 / 80
There is a regular and honest checking of results against predictions. It is called _____________.
16 / 80
It is the ______________ which decides who works on which tasks and on almost all aspects of how they work to deliver the product.
17 / 80
A Scrum development team is ____________ group.
18 / 80
Who is ultimate responsible for the Product Backlog item estimates?
19 / 80
Whose main responsibility is "maximizing the value of the product and the work of the team".
20 / 80
A progress is based on observation and experimentation instead of detailed, upfront planning and defined processes. This is called _________________.
21 / 80
Who defines the Sprint Backlog scope?
22 / 80
The time-box limit for 1 month Sprint is ______________.
23 / 80
_______________ is a core concept in Scrum.
24 / 80
Upon what type of process control is Scrum based?
25 / 80
What happens when all commited itens (requirements) are not completed at the end of the Sprint?
26 / 80
What is the Release Burndown?
27 / 80
The correct sequence of events in using Scrum framework is as follows:
28 / 80
Is Scrum Master a "management" position?
29 / 80
he Development Team should have all the skills needed to:
30 / 80
______________ is responsible to make sure that the 'Product Backlog' is kept up to date.
31 / 80
What is the major difference between Product Backlog and Sprint Backlog?
32 / 80
When is the Sprint Backlog created?
33 / 80
The thinking behind this time-box is that it helps to focus the discussion on the most critical or relevant items.
34 / 80
Who determines when it is appropriate to update the Sprint Backlog during a Sprint?
35 / 80
On a new Scrum Team, the Development Team tell the Scrum Master that they dont feel the need for retrospectives. which answer is correct:
36 / 80
______________ and the team may be missing some skills.
37 / 80
More than one Scrum Team is working on a single project or release. How should the Product Backlog be arranged?
38 / 80
What happens when the Sprint is cancelled?
39 / 80
The Sprint period is short because it allows for faster feedback for the team and can restrict changes of scope during the sprint.
40 / 80
The most encouraged time of day to hold a Scrum Daily Meeting is:
41 / 80
Development Team with __________________ and self-organizing and keeping people informed becomes difficult.
42 / 80
The Scrum framework (team roles, events, artifacts and rules) captures a valid _____________.
43 / 80
When many Scrum Teams are working on the same product, should all of their increments be integrated every Sprint?
44 / 80
What is the primary responsibility of the Scrum Master?
45 / 80
_________________ is the description of what the team aims to achieve during the sprint
46 / 80
________________ is the 'working software' at the end of the increment.
47 / 80
The Sprint Backlog is owned by?
48 / 80
The team plans any new work or changes of priority at _________________.
49 / 80
Development Team members volunteer to own a Sprint Backlog item:
50 / 80
The Product Backlog is mainteined by:
51 / 80
The short period during which the team works on a specific goal is called _______________.
52 / 80
Which of these may a Development Team deliver at the end of a Sprint (choose 2)?
A) A single document, if that is what the Product Owner asked for
B) An increment of software with minor known bugs in it
C) Failing unit tests, to identify acceptance tests for the next Sprint
D) An increment of working software that is "done."
53 / 80
When many Scrum Teams are working on a project, what best describes the definition of "done"?
54 / 80
Who is responsible to clarify details as necessary as the team develops the product.
55 / 80
What does the Sprint Backlog consist of?
56 / 80
What is the Scrum?
57 / 80
Who is responsible to ensure that the backlog is visible and understood by other stakeholders.
58 / 80
Which two are properties of the Daily Scrum? (Choose 2)
A) It is fifteen minutes or less in duration.
B) It is facilitated by the team lead.
C) It consists of the Scrum Master asking the Team members the three questions.
D) Its location and time should remain constant.
59 / 80
Who is on the Scrum Team?
A) Project Manager
B) Project Owner
C) Product Owner
D) Development Team
E) Manager
F) CEO
G) Scrum Master
60 / 80
What is the primary way a Scrum Master keeps a Development Team working at its highest level of productivity?
61 / 80
Who determines the business value of each item the team could be working on.
62 / 80
The Sprint Goal is selected before the Sprint Backlog is created.
63 / 80
It is a starting structure that is rigid and teams can build on. It is absolute and prescriptive. This is ______________.
64 / 80
What is the maximum time that Scrum recommends the team spend in the daily scrum (daily standup)?
65 / 80
Which three activities will a Product Owner likely engage in during a Sprint?
A) Run the daily Scrum
B) Answer questions from the Development Team about items in the current Sprint
C) Update the Sprint burndown chart
D) Work with the stakeholders
E) Prioritize the Development Team's activities.
F) Provide feedback
66 / 80
Who should know the most about the progress toward a business objective or a release, and be able to explain the alternatives most clearly?
67 / 80
__________________ represents the sum of all the product backlog items delivered by the team.
68 / 80
The sprint finishes with two events a _____________ and a ________________.
69 / 80
In ______________ the goals are likely to change during the time the team is working on them.
70 / 80
who is part of the the Sprint and iteration Planning Meeting?
71 / 80
Product Owner are free to involve the team as much as they want in Scrum process and should take no more than ______ of the rest of the time of the team.
72 / 80
Everyone knows what is happening and what the results are at each stage. It is called ______________.
73 / 80
Which statement best describes Scrum?
74 / 80
Which of the following might the Scrum Team discuss during a Sprint Retrospective?
75 / 80
Which three questions are answered by all Development Team members at the Daily Scrum?
A) What work am I going to do today?
B) Why were you late?
C) What impediments are in the way of my accomplishing my work?
D) What work did I do yesterday?
E) How is the Sprint proceeding?
76 / 80
Who is responsible to ensure and work to remove impediments preventing the team from making progress.
77 / 80
Who has the authority to cancel a Sprint?
78 / 80
The Sprint starts with a _______________.
79 / 80
Who acts as a point of contact between the team and the wider organization.
80 / 80
In Development Team there are no specific roles relating to skills or experience or business function. Therefore it is ___________________.