0% You have 1 hours to pass the Assessment Test. PSM 1 - Additional Practice Questions 1 1 / 80 Who determines the business value of each item the team could be working on. Product Owner Development Team Stakeholder Scrum Master 2 / 80 More than one Scrum Team is working on a single project or release. How should the Product Backlog be arranged? All Scrum Teams work from a common Product Backlog and integrate their work every sprint Only one Scrum Team should work on Scrum project Scrum Teams should have their separate Product Backlogs A separate Product Backlog is constructed for each Scrum Team. All of the increments are integrated at the end in an integration Sprint 3 / 80 What is the Release Burndown? A graph indicating what has been completed by the Scrum Team The work remaining to be completed by the Product Owner What has been completed by the Scrum Team to date A measure of the remaining Product Backlog across the time of a release plan 4 / 80 Which of these may a Development Team deliver at the end of a Sprint (choose 2)?A) A single document, if that is what the Product Owner asked forB) An increment of software with minor known bugs in itC) Failing unit tests, to identify acceptance tests for the next SprintD) An increment of working software that is "done." A only C and D B and D D only 5 / 80 Who defines the Sprint Backlog scope? Stakeholders Product Owner Scrum Master Development Team 6 / 80 The Sprint Backlog is owned by? The Scrum Master The Product Owner The Development Team The Scrum Master and Development Team 7 / 80 Upon what type of process control is Scrum based? Defined Empirical Complex Hybrid 8 / 80 What is the maximum time that Scrum recommends the team spend in the daily scrum (daily standup)? Four hours Fifteen minutes Thirty minutes As long as it takes One hour 9 / 80 What is the recommended size for a Development Team? 6, +3 or -3 9 7, +2 or -2 6 10 / 80 ________________ is the 'working software' at the end of the increment. Scrum items The Sprint backlog The Product increment Product backlog 11 / 80 As the Sprint planning progresses, the workload has grown beyond the development team's capacity. Which action makes most sense for the Team? Collaborate with the Product Owner and potentially remove or change items Star the Sprint and recruit additional team members Work overtime for the Sprint Cancel the Sprint 12 / 80 In Development Team there are no specific roles relating to skills or experience or business function. Therefore it is ___________________. learned. non transparent independent cross-functional 13 / 80 Which three questions are answered by all Development Team members at the Daily Scrum?A) What work am I going to do today?B) Why were you late?C) What impediments are in the way of my accomplishing my work?D) What work did I do yesterday?E) How is the Sprint proceeding? ACD BDE CDE ABD 14 / 80 The short period during which the team works on a specific goal is called _______________. a Release Iteration Sprint Cycle Sprint 15 / 80 What is the primary responsibility of the Scrum Master? To Prioritize the Product Backlog To remove any impediments the Development Team encounters during their work To work with the Product Owner to develop the Product Backlog To manage the Development Team 16 / 80 The thinking behind this time-box is that it helps to focus the discussion on the most critical or relevant items. False True 17 / 80 Who is responsible to ensure that the backlog is visible and understood by other stakeholders. Stakeholders Development Team Scrum Master Product Owner 18 / 80 The Scrum framework (team roles, events, artifacts and rules) captures a valid _____________. Sprint Planning Empirical approach. Inspection Sprint Review 19 / 80 Who should know the most about the progress toward a business objective or a release, and be able to explain the alternatives most clearly? The Product Owner The Project Manager The Scrum Master The Development Team 20 / 80 Everyone knows what is happening and what the results are at each stage. It is called ______________. Transparency Iterative Adaptation Prioritization 21 / 80 What is the maximum amount of time a sprint retrospective should take? 1 hour 3 hours, for an 30 days Sprint 1 and half hour 22 / 80 Who is responsible for reviewing both the value of the individual items and the ordering or ranking of the backlog items by relative priority. Stakeholders Scrum Master Development Team Product Owner 23 / 80 The Product Backlog is mainteined by: The Scrum Master The Development Team The Product Owner The Product Owner and Scrum Master 24 / 80 When many Scrum Teams are working on a project, what best describes the definition of "done"? Each Team defines and uses its own It depends Each Team uses its own but must make it clear to all other Teams All teams must use the same definition 25 / 80 Which two are properties of the Daily Scrum? (Choose 2)A) It is fifteen minutes or less in duration.B) It is facilitated by the team lead.C) It consists of the Scrum Master asking the Team members the three questions.D) Its location and time should remain constant. CD AD BC AB 26 / 80 When is the Sprint Backlog created? At the beginning of the project Prior to the Sprint Planning meeting During the Sprint Planning meeting During the Sprint 27 / 80 A progress is based on observation and experimentation instead of detailed, upfront planning and defined processes. This is called _________________. Complex process Empirical process Agile Process Adaptation 28 / 80 Product Owner are free to involve the team as much as they want in Scrum process and should take no more than ______ of the rest of the time of the team. 5% 15% 20% 10% 29 / 80 What happens when the Sprint is cancelled? The Scrum Team disbands immediately The completed Sprint Backlog items are evaluated for a release and incomplete items are discarded The complete Sprint Backlog is put back to the Product Backlog The completed Sprint Backlog items are evaluated for a release and incomplete items are put back to the Product Backlog 30 / 80 _______________ is a core concept in Scrum. Iteration Enhancements Sprint Product Backlog 31 / 80 Each day during the sprint the team has a daily scrum meeting _________________. to plan and assign work. to update Product Manager to track progress and refocus. to update Scrum Master 32 / 80 Who determines when it is appropriate to update the Sprint Backlog during a Sprint? The Development Team The Product Owner The Project Manager The Scrum Team 33 / 80 Who is responsible to ensure and work to remove impediments preventing the team from making progress. Product Owner Development Team Scrum Master Stakeholder 34 / 80 _________________ may have particular areas of expertise or experience but can work on any task that needs to be done. Business Analyst Scrum Master Development Teams Product Owner 35 / 80 A Scrum development team is ____________ group. a non-structured a cross-functional a goal oriented an independent 36 / 80 The Sprint starts with a _______________. Sprint Retrospective Sprint goal. Sprint planning meeting. Sprint Estimates 37 / 80 Who acts as a point of contact between the team and the wider organization. Stakeholder Development Product Owner Scrum Master 38 / 80 The team plans any new work or changes of priority at _________________. the start of the next Sprint the end of new Release the start of new Release the end of Sprint Cycle 39 / 80 he Development Team should have all the skills needed to: Complete the project as estimated when the date and cost are committed to the Product Owner. Do all of the development work, but not the types of testing that require specialized testing, tools, and environments. Turn the Product Backlog it selects into an increment of potentially shippable product functionality. 40 / 80 Development Team consists of between _______ and ______ people with the skills required to deliver the product. seven, eleven four, nine three, twelve three, nine 41 / 80 Who is ultimate responsible for the Product Backlog item estimates? Scrum Master Project Owner The Development Team Stakeholders 42 / 80 ______________ is responsible to make sure that the 'Product Backlog' is kept up to date. Stakeholder Scrum Master Development Team Product Owner 43 / 80 What is the major difference between Product Backlog and Sprint Backlog? The Product Backlog is equal to the Sprint Backlog The Sprint Backlog is a subset of the Product Backlog The Product Backlog is a subset of the Sprint Backlog The Sprint Backlog is owned by the Product Owner 44 / 80 _________________ is the description of what the team aims to achieve during the sprint Product increment list The Sprint Goal The Product list Product refinement list 45 / 80 who is part of the the Sprint and iteration Planning Meeting? Scrum Master and Development Team Product Owner and Stakeholder Product Owner and Scrum Master Product Owner and Development Team 46 / 80 Whose main responsibility is "maximizing the value of the product and the work of the team". Product Owner Scrum Team Scrum Master Development Team 47 / 80 The team is able to use the feedback provided by inspection to adjust what they are doing. This is called ____________. Inspection Adaption Openness Transparency 48 / 80 On a new Scrum Team, the Development Team tell the Scrum Master that they dont feel the need for retrospectives. which answer is correct: Discuss with product owner None of above Start doing retrospectives 49 / 80 Which three activities will a Product Owner likely engage in during a Sprint?A) Run the daily ScrumB) Answer questions from the Development Team about items in the current SprintC) Update the Sprint burndown chartD) Work with the stakeholdersE) Prioritize the Development Team's activities.F) Provide feedback ABCE ACE BDF ACF 50 / 80 Which objectives are covered as part of Sprint Planning? Recalculating empirical velocity, adjusting team capacity accordingly, and projecting end dates Reviewing current functionality that binds the software solution Understanding what functionality the Product Owner desires within the next Sprint and figuring out how to do it. Updating the scope of the release with all Sprints, end dates, and costs 51 / 80 What does the Sprint Backlog consist of? User Stories, only. Selected Backlog Items and Tasks Use Cases Test cases 52 / 80 Who is on the Scrum Team?A) Project ManagerB) Project OwnerC) Product OwnerD) Development TeamE) ManagerF) CEOG) Scrum Master DFG CDG BDF ADG 53 / 80 There is a regular and honest checking of results against predictions. It is called _____________. Framework Adaptation Challenges Inspection 54 / 80 ______________ and the team may be missing some skills. Less than three people Less than four people Less than nine people Less than seven 55 / 80 __________________ represents the sum of all the product backlog items delivered by the team. Sprint refinement document Sprint plan Product Increment document Sprint backlog 56 / 80 Who is responsible to clarify details as necessary as the team develops the product. Development Team Product Owner Scrum Master Stakeholders 57 / 80 Who is responsible to ensure and help the team to understand the scrum process and to ensure that the process is being followed. Scrum Master Development Team Product Owner Stakeholders 58 / 80 The Scrum Master role is described as a _______________ role. learned authoritative decision maker servant-leader 59 / 80 The sprint finishes with two events a _____________ and a ________________. Sprint approval, Sprint Re-planning Sprint Review, Sprint Retrospective Sprint Retrospective, Done Document. Sprint goal, Sprint Review 60 / 80 What happens when all commited itens (requirements) are not completed at the end of the Sprint? The tasks are determined to be unnecessary None of the above They return to the product backlog The Sprint duration is extended 61 / 80 The correct sequence of events in using Scrum framework is as follows: Sprint Planning, Sprint, Daily Scrum, Sprint Review, and Sprint Retrospective Sprint Planning, Daily Scrum, Sprint, Sprint Review, and Sprint Retrospective Sprint Planning, Sprint, Sprint Retrospective, Daily Scrum, and Sprint Review Sprint Planning, Sprint, Sprint Retrospective, Daily Scrum, and Sprint Review 62 / 80 It is the ______________ which decides who works on which tasks and on almost all aspects of how they work to deliver the product. Product Owner Development Team Scrum Team Project Manager 63 / 80 When should the Product Owner ship or implement a Sprint increment? When the Team feels is done with every Sprint Whenever the increment is free of defects When it makes sense At the end of every Sprint 64 / 80 Which statement best describes Scrum? A cookbook that defines best practices for software development A defined and predictive process that conforms to the principles of Scientific Management A framework within which complex products in complex environments are developed A complete methodology that defines how to develop software 65 / 80 The Sprint period is short because it allows for faster feedback for the team and can restrict changes of scope during the sprint. False True 66 / 80 Which of the following might the Scrum Team discuss during a Sprint Retrospective? All of the above Methods of communication Skills needed to improve the Development Team's ability to deliver Its Definition of Done The way the Scrum Team does Sprint Planning 67 / 80 Development Team with __________________ and self-organizing and keeping people informed becomes difficult. More than seven people More than twelve people More than five people More than nine people 68 / 80 The time-box limit for 1 month Sprint is ______________. 10hrs 8hrs 3hrs 4hrs 69 / 80 When many Scrum Teams are working on the same product, should all of their increments be integrated every Sprint? No, that is far too hard No, each Scrum Team stands alone Yes, otherwise Product Owners may not be able to inspect what is done accurately Yes, but only the Scrum's Teams whose work has dependencies 70 / 80 What is the Scrum? Scrum is a complete process to develop software None of above A framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value It's not a Agile Framework 71 / 80 What is the primary way a Scrum Master keeps a Development Team working at its highest level of productivity? By facilitating Development Team decisions and removing impediments By ensuring the meetings start and end at the proper time By preventing changes to the Backlog once the Sprint begins By keeping high value features high in the Product Backlog 72 / 80 Development Team members volunteer to own a Sprint Backlog item: Never. All Sprint Backlog Items are "owned" by the entire Development Team, even though each one may be done by an individual team member At the Sprint planning meeting Whenever a team member can accommodate more work During the Daily Scrum 73 / 80 The most encouraged time of day to hold a Scrum Daily Meeting is: End of the day Immediately after lunch A beginning of the day Before lunch 74 / 80 In ______________ the goals are likely to change during the time the team is working on them. Complex System Inspection Iterative Adaptive 75 / 80 Who has the authority to cancel a Sprint? The team members The Product Owner The Development Team The Scrum Master 76 / 80 The Sprint Goal is selected before the Sprint Backlog is created. False True 77 / 80 Who is required to attend the Daily Scrum? Development Team and Scrum Master Scrum Master Development Team and Product Owner Development Team 78 / 80 It is a starting structure that is rigid and teams can build on. It is absolute and prescriptive. This is ______________. Inspection Adaptation Scrum a Project Plan 79 / 80 Is Scrum Master a "management" position? No Yes 80 / 80 Who acts as a mentor or coach for the team. Project Manager Scrum Master Development Team Product Owner Your score is The average score is 77% LinkedIn Facebook Twitter 0% Restart quiz
You have 1 hours to pass the Assessment Test.
PSM 1 - Additional Practice Questions 1
1 / 80
Who determines the business value of each item the team could be working on.
2 / 80
More than one Scrum Team is working on a single project or release. How should the Product Backlog be arranged?
3 / 80
What is the Release Burndown?
4 / 80
Which of these may a Development Team deliver at the end of a Sprint (choose 2)?
A) A single document, if that is what the Product Owner asked for
B) An increment of software with minor known bugs in it
C) Failing unit tests, to identify acceptance tests for the next Sprint
D) An increment of working software that is "done."
5 / 80
Who defines the Sprint Backlog scope?
6 / 80
The Sprint Backlog is owned by?
7 / 80
Upon what type of process control is Scrum based?
8 / 80
What is the maximum time that Scrum recommends the team spend in the daily scrum (daily standup)?
9 / 80
What is the recommended size for a Development Team?
10 / 80
________________ is the 'working software' at the end of the increment.
11 / 80
As the Sprint planning progresses, the workload has grown beyond the development team's capacity. Which action makes most sense for the Team?
12 / 80
In Development Team there are no specific roles relating to skills or experience or business function. Therefore it is ___________________.
13 / 80
Which three questions are answered by all Development Team members at the Daily Scrum?
A) What work am I going to do today?
B) Why were you late?
C) What impediments are in the way of my accomplishing my work?
D) What work did I do yesterday?
E) How is the Sprint proceeding?
14 / 80
The short period during which the team works on a specific goal is called _______________.
15 / 80
What is the primary responsibility of the Scrum Master?
16 / 80
The thinking behind this time-box is that it helps to focus the discussion on the most critical or relevant items.
17 / 80
Who is responsible to ensure that the backlog is visible and understood by other stakeholders.
18 / 80
The Scrum framework (team roles, events, artifacts and rules) captures a valid _____________.
19 / 80
Who should know the most about the progress toward a business objective or a release, and be able to explain the alternatives most clearly?
20 / 80
Everyone knows what is happening and what the results are at each stage. It is called ______________.
21 / 80
What is the maximum amount of time a sprint retrospective should take?
22 / 80
Who is responsible for reviewing both the value of the individual items and the ordering or ranking of the backlog items by relative priority.
23 / 80
The Product Backlog is mainteined by:
24 / 80
When many Scrum Teams are working on a project, what best describes the definition of "done"?
25 / 80
Which two are properties of the Daily Scrum? (Choose 2)
A) It is fifteen minutes or less in duration.
B) It is facilitated by the team lead.
C) It consists of the Scrum Master asking the Team members the three questions.
D) Its location and time should remain constant.
26 / 80
When is the Sprint Backlog created?
27 / 80
A progress is based on observation and experimentation instead of detailed, upfront planning and defined processes. This is called _________________.
28 / 80
Product Owner are free to involve the team as much as they want in Scrum process and should take no more than ______ of the rest of the time of the team.
29 / 80
What happens when the Sprint is cancelled?
30 / 80
_______________ is a core concept in Scrum.
31 / 80
Each day during the sprint the team has a daily scrum meeting _________________.
32 / 80
Who determines when it is appropriate to update the Sprint Backlog during a Sprint?
33 / 80
Who is responsible to ensure and work to remove impediments preventing the team from making progress.
34 / 80
_________________ may have particular areas of expertise or experience but can work on any task that needs to be done.
35 / 80
A Scrum development team is ____________ group.
36 / 80
The Sprint starts with a _______________.
37 / 80
Who acts as a point of contact between the team and the wider organization.
38 / 80
The team plans any new work or changes of priority at _________________.
39 / 80
he Development Team should have all the skills needed to:
40 / 80
Development Team consists of between _______ and ______ people with the skills required to deliver the product.
41 / 80
Who is ultimate responsible for the Product Backlog item estimates?
42 / 80
______________ is responsible to make sure that the 'Product Backlog' is kept up to date.
43 / 80
What is the major difference between Product Backlog and Sprint Backlog?
44 / 80
_________________ is the description of what the team aims to achieve during the sprint
45 / 80
who is part of the the Sprint and iteration Planning Meeting?
46 / 80
Whose main responsibility is "maximizing the value of the product and the work of the team".
47 / 80
The team is able to use the feedback provided by inspection to adjust what they are doing. This is called ____________.
48 / 80
On a new Scrum Team, the Development Team tell the Scrum Master that they dont feel the need for retrospectives. which answer is correct:
49 / 80
Which three activities will a Product Owner likely engage in during a Sprint?
A) Run the daily Scrum
B) Answer questions from the Development Team about items in the current Sprint
C) Update the Sprint burndown chart
D) Work with the stakeholders
E) Prioritize the Development Team's activities.
F) Provide feedback
50 / 80
Which objectives are covered as part of Sprint Planning?
51 / 80
What does the Sprint Backlog consist of?
52 / 80
Who is on the Scrum Team?
A) Project Manager
B) Project Owner
C) Product Owner
D) Development Team
E) Manager
F) CEO
G) Scrum Master
53 / 80
There is a regular and honest checking of results against predictions. It is called _____________.
54 / 80
______________ and the team may be missing some skills.
55 / 80
__________________ represents the sum of all the product backlog items delivered by the team.
56 / 80
Who is responsible to clarify details as necessary as the team develops the product.
57 / 80
Who is responsible to ensure and help the team to understand the scrum process and to ensure that the process is being followed.
58 / 80
The Scrum Master role is described as a _______________ role.
59 / 80
The sprint finishes with two events a _____________ and a ________________.
60 / 80
What happens when all commited itens (requirements) are not completed at the end of the Sprint?
61 / 80
The correct sequence of events in using Scrum framework is as follows:
62 / 80
It is the ______________ which decides who works on which tasks and on almost all aspects of how they work to deliver the product.
63 / 80
When should the Product Owner ship or implement a Sprint increment?
64 / 80
Which statement best describes Scrum?
65 / 80
The Sprint period is short because it allows for faster feedback for the team and can restrict changes of scope during the sprint.
66 / 80
Which of the following might the Scrum Team discuss during a Sprint Retrospective?
67 / 80
Development Team with __________________ and self-organizing and keeping people informed becomes difficult.
68 / 80
The time-box limit for 1 month Sprint is ______________.
69 / 80
When many Scrum Teams are working on the same product, should all of their increments be integrated every Sprint?
70 / 80
What is the Scrum?
71 / 80
What is the primary way a Scrum Master keeps a Development Team working at its highest level of productivity?
72 / 80
Development Team members volunteer to own a Sprint Backlog item:
73 / 80
The most encouraged time of day to hold a Scrum Daily Meeting is:
74 / 80
In ______________ the goals are likely to change during the time the team is working on them.
75 / 80
Who has the authority to cancel a Sprint?
76 / 80
The Sprint Goal is selected before the Sprint Backlog is created.
77 / 80
Who is required to attend the Daily Scrum?
78 / 80
It is a starting structure that is rigid and teams can build on. It is absolute and prescriptive. This is ______________.
79 / 80
Is Scrum Master a "management" position?
80 / 80
Who acts as a mentor or coach for the team.