0% You have 1 hours to pass the Assessment Test. PSM 1 - Additional Practice Questions 1 1 / 80 _________________ is the description of what the team aims to achieve during the sprint The Sprint Goal Product increment list The Product list Product refinement list 2 / 80 Who determines when it is appropriate to update the Sprint Backlog during a Sprint? The Project Manager The Development Team The Scrum Team The Product Owner 3 / 80 Who is responsible to clarify details as necessary as the team develops the product. Scrum Master Product Owner Stakeholders Development Team 4 / 80 What is the primary responsibility of the Scrum Master? To manage the Development Team To Prioritize the Product Backlog To remove any impediments the Development Team encounters during their work To work with the Product Owner to develop the Product Backlog 5 / 80 The team plans any new work or changes of priority at _________________. the start of the next Sprint the end of new Release the end of Sprint Cycle the start of new Release 6 / 80 Who is on the Scrum Team?A) Project ManagerB) Project OwnerC) Product OwnerD) Development TeamE) ManagerF) CEOG) Scrum Master BDF CDG ADG DFG 7 / 80 A progress is based on observation and experimentation instead of detailed, upfront planning and defined processes. This is called _________________. Complex process Empirical process Adaptation Agile Process 8 / 80 What does the Sprint Backlog consist of? User Stories, only. Use Cases Test cases Selected Backlog Items and Tasks 9 / 80 The Scrum framework (team roles, events, artifacts and rules) captures a valid _____________. Sprint Review Inspection Sprint Planning Empirical approach. 10 / 80 he Development Team should have all the skills needed to: Complete the project as estimated when the date and cost are committed to the Product Owner. Turn the Product Backlog it selects into an increment of potentially shippable product functionality. Do all of the development work, but not the types of testing that require specialized testing, tools, and environments. 11 / 80 When is the Sprint Backlog created? At the beginning of the project Prior to the Sprint Planning meeting During the Sprint During the Sprint Planning meeting 12 / 80 More than one Scrum Team is working on a single project or release. How should the Product Backlog be arranged? Only one Scrum Team should work on Scrum project Scrum Teams should have their separate Product Backlogs All Scrum Teams work from a common Product Backlog and integrate their work every sprint A separate Product Backlog is constructed for each Scrum Team. All of the increments are integrated at the end in an integration Sprint 13 / 80 What is the primary way a Scrum Master keeps a Development Team working at its highest level of productivity? By ensuring the meetings start and end at the proper time By keeping high value features high in the Product Backlog By preventing changes to the Backlog once the Sprint begins By facilitating Development Team decisions and removing impediments 14 / 80 What is the maximum amount of time a sprint retrospective should take? 1 hour 3 hours, for an 30 days Sprint 1 and half hour 15 / 80 Who is responsible for reviewing both the value of the individual items and the ordering or ranking of the backlog items by relative priority. Product Owner Stakeholders Development Team Scrum Master 16 / 80 The time-box limit for 1 month Sprint is ______________. 8hrs 3hrs 10hrs 4hrs 17 / 80 Who acts as a point of contact between the team and the wider organization. Scrum Master Stakeholder Product Owner Development 18 / 80 What happens when all commited itens (requirements) are not completed at the end of the Sprint? The tasks are determined to be unnecessary They return to the product backlog The Sprint duration is extended None of the above 19 / 80 What is the Scrum? It's not a Agile Framework Scrum is a complete process to develop software A framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value None of above 20 / 80 Which of the following might the Scrum Team discuss during a Sprint Retrospective? The way the Scrum Team does Sprint Planning Its Definition of Done All of the above Skills needed to improve the Development Team's ability to deliver Methods of communication 21 / 80 The sprint finishes with two events a _____________ and a ________________. Sprint goal, Sprint Review Sprint Retrospective, Done Document. Sprint approval, Sprint Re-planning Sprint Review, Sprint Retrospective 22 / 80 The Sprint Backlog is owned by? The Development Team The Scrum Master and Development Team The Product Owner The Scrum Master 23 / 80 ______________ is responsible to make sure that the 'Product Backlog' is kept up to date. Product Owner Scrum Master Stakeholder Development Team 24 / 80 Development Team with __________________ and self-organizing and keeping people informed becomes difficult. More than twelve people More than seven people More than five people More than nine people 25 / 80 The thinking behind this time-box is that it helps to focus the discussion on the most critical or relevant items. True False 26 / 80 Who defines the Sprint Backlog scope? Scrum Master Stakeholders Product Owner Development Team 27 / 80 Which three activities will a Product Owner likely engage in during a Sprint?A) Run the daily ScrumB) Answer questions from the Development Team about items in the current SprintC) Update the Sprint burndown chartD) Work with the stakeholdersE) Prioritize the Development Team's activities.F) Provide feedback ACE ABCE BDF ACF 28 / 80 What is the recommended size for a Development Team? 6, +3 or -3 6 9 7, +2 or -2 29 / 80 ______________ and the team may be missing some skills. Less than four people Less than three people Less than nine people Less than seven 30 / 80 The Product Backlog is mainteined by: The Development Team The Product Owner The Product Owner and Scrum Master The Scrum Master 31 / 80 Which of these may a Development Team deliver at the end of a Sprint (choose 2)?A) A single document, if that is what the Product Owner asked forB) An increment of software with minor known bugs in itC) Failing unit tests, to identify acceptance tests for the next SprintD) An increment of working software that is "done." A only B and D D only C and D 32 / 80 The short period during which the team works on a specific goal is called _______________. Iteration a Release Sprint Sprint Cycle 33 / 80 Who is ultimate responsible for the Product Backlog item estimates? Scrum Master Stakeholders The Development Team Project Owner 34 / 80 who is part of the the Sprint and iteration Planning Meeting? Product Owner and Development Team Product Owner and Stakeholder Scrum Master and Development Team Product Owner and Scrum Master 35 / 80 There is a regular and honest checking of results against predictions. It is called _____________. Challenges Framework Adaptation Inspection 36 / 80 When many Scrum Teams are working on a project, what best describes the definition of "done"? All teams must use the same definition Each Team defines and uses its own It depends Each Team uses its own but must make it clear to all other Teams 37 / 80 Is Scrum Master a "management" position? Yes No 38 / 80 When many Scrum Teams are working on the same product, should all of their increments be integrated every Sprint? Yes, but only the Scrum's Teams whose work has dependencies Yes, otherwise Product Owners may not be able to inspect what is done accurately No, each Scrum Team stands alone No, that is far too hard 39 / 80 Which two are properties of the Daily Scrum? (Choose 2)A) It is fifteen minutes or less in duration.B) It is facilitated by the team lead.C) It consists of the Scrum Master asking the Team members the three questions.D) Its location and time should remain constant. CD BC AB AD 40 / 80 The Sprint Goal is selected before the Sprint Backlog is created. True False 41 / 80 Who acts as a mentor or coach for the team. Product Owner Scrum Master Project Manager Development Team 42 / 80 Development Team consists of between _______ and ______ people with the skills required to deliver the product. three, twelve three, nine four, nine seven, eleven 43 / 80 Whose main responsibility is "maximizing the value of the product and the work of the team". Development Team Product Owner Scrum Master Scrum Team 44 / 80 Who is required to attend the Daily Scrum? Development Team and Scrum Master Development Team and Product Owner Development Team Scrum Master 45 / 80 ________________ is the 'working software' at the end of the increment. Scrum items Product backlog The Sprint backlog The Product increment 46 / 80 Who is responsible to ensure and work to remove impediments preventing the team from making progress. Product Owner Stakeholder Development Team Scrum Master 47 / 80 It is a starting structure that is rigid and teams can build on. It is absolute and prescriptive. This is ______________. Scrum Inspection Adaptation a Project Plan 48 / 80 Development Team members volunteer to own a Sprint Backlog item: Never. All Sprint Backlog Items are "owned" by the entire Development Team, even though each one may be done by an individual team member At the Sprint planning meeting During the Daily Scrum Whenever a team member can accommodate more work 49 / 80 Product Owner are free to involve the team as much as they want in Scrum process and should take no more than ______ of the rest of the time of the team. 20% 5% 10% 15% 50 / 80 __________________ represents the sum of all the product backlog items delivered by the team. Sprint plan Product Increment document Sprint backlog Sprint refinement document 51 / 80 What happens when the Sprint is cancelled? The complete Sprint Backlog is put back to the Product Backlog The completed Sprint Backlog items are evaluated for a release and incomplete items are discarded The completed Sprint Backlog items are evaluated for a release and incomplete items are put back to the Product Backlog The Scrum Team disbands immediately 52 / 80 In Development Team there are no specific roles relating to skills or experience or business function. Therefore it is ___________________. cross-functional independent learned. non transparent 53 / 80 The Scrum Master role is described as a _______________ role. learned authoritative decision maker servant-leader 54 / 80 Upon what type of process control is Scrum based? Complex Defined Hybrid Empirical 55 / 80 A Scrum development team is ____________ group. a goal oriented an independent a cross-functional a non-structured 56 / 80 As the Sprint planning progresses, the workload has grown beyond the development team's capacity. Which action makes most sense for the Team? Collaborate with the Product Owner and potentially remove or change items Cancel the Sprint Work overtime for the Sprint Star the Sprint and recruit additional team members 57 / 80 Everyone knows what is happening and what the results are at each stage. It is called ______________. Prioritization Iterative Transparency Adaptation 58 / 80 Which statement best describes Scrum? A framework within which complex products in complex environments are developed A complete methodology that defines how to develop software A cookbook that defines best practices for software development A defined and predictive process that conforms to the principles of Scientific Management 59 / 80 The team is able to use the feedback provided by inspection to adjust what they are doing. This is called ____________. Openness Adaption Inspection Transparency 60 / 80 Who is responsible to ensure and help the team to understand the scrum process and to ensure that the process is being followed. Scrum Master Development Team Stakeholders Product Owner 61 / 80 The Sprint starts with a _______________. Sprint Estimates Sprint Retrospective Sprint planning meeting. Sprint goal. 62 / 80 In ______________ the goals are likely to change during the time the team is working on them. Complex System Iterative Inspection Adaptive 63 / 80 On a new Scrum Team, the Development Team tell the Scrum Master that they dont feel the need for retrospectives. which answer is correct: Discuss with product owner Start doing retrospectives None of above 64 / 80 When should the Product Owner ship or implement a Sprint increment? When the Team feels is done with every Sprint Whenever the increment is free of defects At the end of every Sprint When it makes sense 65 / 80 Which three questions are answered by all Development Team members at the Daily Scrum?A) What work am I going to do today?B) Why were you late?C) What impediments are in the way of my accomplishing my work?D) What work did I do yesterday?E) How is the Sprint proceeding? ABD ACD CDE BDE 66 / 80 _________________ may have particular areas of expertise or experience but can work on any task that needs to be done. Development Teams Scrum Master Product Owner Business Analyst 67 / 80 The Sprint period is short because it allows for faster feedback for the team and can restrict changes of scope during the sprint. True False 68 / 80 Who has the authority to cancel a Sprint? The team members The Scrum Master The Development Team The Product Owner 69 / 80 The correct sequence of events in using Scrum framework is as follows: Sprint Planning, Sprint, Sprint Retrospective, Daily Scrum, and Sprint Review Sprint Planning, Sprint, Sprint Retrospective, Daily Scrum, and Sprint Review Sprint Planning, Sprint, Daily Scrum, Sprint Review, and Sprint Retrospective Sprint Planning, Daily Scrum, Sprint, Sprint Review, and Sprint Retrospective 70 / 80 Who should know the most about the progress toward a business objective or a release, and be able to explain the alternatives most clearly? The Project Manager The Development Team The Product Owner The Scrum Master 71 / 80 Which objectives are covered as part of Sprint Planning? Recalculating empirical velocity, adjusting team capacity accordingly, and projecting end dates Updating the scope of the release with all Sprints, end dates, and costs Reviewing current functionality that binds the software solution Understanding what functionality the Product Owner desires within the next Sprint and figuring out how to do it. 72 / 80 Who is responsible to ensure that the backlog is visible and understood by other stakeholders. Stakeholders Product Owner Scrum Master Development Team 73 / 80 Each day during the sprint the team has a daily scrum meeting _________________. to plan and assign work. to update Scrum Master to track progress and refocus. to update Product Manager 74 / 80 What is the major difference between Product Backlog and Sprint Backlog? The Sprint Backlog is owned by the Product Owner The Product Backlog is a subset of the Sprint Backlog The Sprint Backlog is a subset of the Product Backlog The Product Backlog is equal to the Sprint Backlog 75 / 80 The most encouraged time of day to hold a Scrum Daily Meeting is: End of the day A beginning of the day Before lunch Immediately after lunch 76 / 80 What is the Release Burndown? The work remaining to be completed by the Product Owner A graph indicating what has been completed by the Scrum Team A measure of the remaining Product Backlog across the time of a release plan What has been completed by the Scrum Team to date 77 / 80 Who determines the business value of each item the team could be working on. Scrum Master Product Owner Development Team Stakeholder 78 / 80 It is the ______________ which decides who works on which tasks and on almost all aspects of how they work to deliver the product. Project Manager Product Owner Development Team Scrum Team 79 / 80 _______________ is a core concept in Scrum. Sprint Product Backlog Iteration Enhancements 80 / 80 What is the maximum time that Scrum recommends the team spend in the daily scrum (daily standup)? Fifteen minutes One hour Thirty minutes Four hours As long as it takes Your score is The average score is 81% LinkedIn Facebook Twitter 0% Restart quiz
You have 1 hours to pass the Assessment Test.
PSM 1 - Additional Practice Questions 1
1 / 80
_________________ is the description of what the team aims to achieve during the sprint
2 / 80
Who determines when it is appropriate to update the Sprint Backlog during a Sprint?
3 / 80
Who is responsible to clarify details as necessary as the team develops the product.
4 / 80
What is the primary responsibility of the Scrum Master?
5 / 80
The team plans any new work or changes of priority at _________________.
6 / 80
Who is on the Scrum Team?
A) Project Manager
B) Project Owner
C) Product Owner
D) Development Team
E) Manager
F) CEO
G) Scrum Master
7 / 80
A progress is based on observation and experimentation instead of detailed, upfront planning and defined processes. This is called _________________.
8 / 80
What does the Sprint Backlog consist of?
9 / 80
The Scrum framework (team roles, events, artifacts and rules) captures a valid _____________.
10 / 80
he Development Team should have all the skills needed to:
11 / 80
When is the Sprint Backlog created?
12 / 80
More than one Scrum Team is working on a single project or release. How should the Product Backlog be arranged?
13 / 80
What is the primary way a Scrum Master keeps a Development Team working at its highest level of productivity?
14 / 80
What is the maximum amount of time a sprint retrospective should take?
15 / 80
Who is responsible for reviewing both the value of the individual items and the ordering or ranking of the backlog items by relative priority.
16 / 80
The time-box limit for 1 month Sprint is ______________.
17 / 80
Who acts as a point of contact between the team and the wider organization.
18 / 80
What happens when all commited itens (requirements) are not completed at the end of the Sprint?
19 / 80
What is the Scrum?
20 / 80
Which of the following might the Scrum Team discuss during a Sprint Retrospective?
21 / 80
The sprint finishes with two events a _____________ and a ________________.
22 / 80
The Sprint Backlog is owned by?
23 / 80
______________ is responsible to make sure that the 'Product Backlog' is kept up to date.
24 / 80
Development Team with __________________ and self-organizing and keeping people informed becomes difficult.
25 / 80
The thinking behind this time-box is that it helps to focus the discussion on the most critical or relevant items.
26 / 80
Who defines the Sprint Backlog scope?
27 / 80
Which three activities will a Product Owner likely engage in during a Sprint?
A) Run the daily Scrum
B) Answer questions from the Development Team about items in the current Sprint
C) Update the Sprint burndown chart
D) Work with the stakeholders
E) Prioritize the Development Team's activities.
F) Provide feedback
28 / 80
What is the recommended size for a Development Team?
29 / 80
______________ and the team may be missing some skills.
30 / 80
The Product Backlog is mainteined by:
31 / 80
Which of these may a Development Team deliver at the end of a Sprint (choose 2)?
A) A single document, if that is what the Product Owner asked for
B) An increment of software with minor known bugs in it
C) Failing unit tests, to identify acceptance tests for the next Sprint
D) An increment of working software that is "done."
32 / 80
The short period during which the team works on a specific goal is called _______________.
33 / 80
Who is ultimate responsible for the Product Backlog item estimates?
34 / 80
who is part of the the Sprint and iteration Planning Meeting?
35 / 80
There is a regular and honest checking of results against predictions. It is called _____________.
36 / 80
When many Scrum Teams are working on a project, what best describes the definition of "done"?
37 / 80
Is Scrum Master a "management" position?
38 / 80
When many Scrum Teams are working on the same product, should all of their increments be integrated every Sprint?
39 / 80
Which two are properties of the Daily Scrum? (Choose 2)
A) It is fifteen minutes or less in duration.
B) It is facilitated by the team lead.
C) It consists of the Scrum Master asking the Team members the three questions.
D) Its location and time should remain constant.
40 / 80
The Sprint Goal is selected before the Sprint Backlog is created.
41 / 80
Who acts as a mentor or coach for the team.
42 / 80
Development Team consists of between _______ and ______ people with the skills required to deliver the product.
43 / 80
Whose main responsibility is "maximizing the value of the product and the work of the team".
44 / 80
Who is required to attend the Daily Scrum?
45 / 80
________________ is the 'working software' at the end of the increment.
46 / 80
Who is responsible to ensure and work to remove impediments preventing the team from making progress.
47 / 80
It is a starting structure that is rigid and teams can build on. It is absolute and prescriptive. This is ______________.
48 / 80
Development Team members volunteer to own a Sprint Backlog item:
49 / 80
Product Owner are free to involve the team as much as they want in Scrum process and should take no more than ______ of the rest of the time of the team.
50 / 80
__________________ represents the sum of all the product backlog items delivered by the team.
51 / 80
What happens when the Sprint is cancelled?
52 / 80
In Development Team there are no specific roles relating to skills or experience or business function. Therefore it is ___________________.
53 / 80
The Scrum Master role is described as a _______________ role.
54 / 80
Upon what type of process control is Scrum based?
55 / 80
A Scrum development team is ____________ group.
56 / 80
As the Sprint planning progresses, the workload has grown beyond the development team's capacity. Which action makes most sense for the Team?
57 / 80
Everyone knows what is happening and what the results are at each stage. It is called ______________.
58 / 80
Which statement best describes Scrum?
59 / 80
The team is able to use the feedback provided by inspection to adjust what they are doing. This is called ____________.
60 / 80
Who is responsible to ensure and help the team to understand the scrum process and to ensure that the process is being followed.
61 / 80
The Sprint starts with a _______________.
62 / 80
In ______________ the goals are likely to change during the time the team is working on them.
63 / 80
On a new Scrum Team, the Development Team tell the Scrum Master that they dont feel the need for retrospectives. which answer is correct:
64 / 80
When should the Product Owner ship or implement a Sprint increment?
65 / 80
Which three questions are answered by all Development Team members at the Daily Scrum?
A) What work am I going to do today?
B) Why were you late?
C) What impediments are in the way of my accomplishing my work?
D) What work did I do yesterday?
E) How is the Sprint proceeding?
66 / 80
_________________ may have particular areas of expertise or experience but can work on any task that needs to be done.
67 / 80
The Sprint period is short because it allows for faster feedback for the team and can restrict changes of scope during the sprint.
68 / 80
Who has the authority to cancel a Sprint?
69 / 80
The correct sequence of events in using Scrum framework is as follows:
70 / 80
Who should know the most about the progress toward a business objective or a release, and be able to explain the alternatives most clearly?
71 / 80
Which objectives are covered as part of Sprint Planning?
72 / 80
Who is responsible to ensure that the backlog is visible and understood by other stakeholders.
73 / 80
Each day during the sprint the team has a daily scrum meeting _________________.
74 / 80
What is the major difference between Product Backlog and Sprint Backlog?
75 / 80
The most encouraged time of day to hold a Scrum Daily Meeting is:
76 / 80
What is the Release Burndown?
77 / 80
Who determines the business value of each item the team could be working on.
78 / 80
It is the ______________ which decides who works on which tasks and on almost all aspects of how they work to deliver the product.
79 / 80
_______________ is a core concept in Scrum.
80 / 80
What is the maximum time that Scrum recommends the team spend in the daily scrum (daily standup)?